logo

Malaysia Singapore P10 type Movable steel beam construction bridge pier concrete formwork

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Towers of power: California’s Gerald Desmond Bridge

Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods. much of it with Asia. As the Port of Long Beach was growing in importance over the past half ...

A Guide to Scaffold Use in the Construction

suspension types that are less than 36 inches (0,9, m) wide to prevent instability, 1926,452(p)(1) | To make swaged attachments or spliced eyes on wire suspension ropes, 1926,451(d)(11) • For Components and Design: | To design scaffold components construction in accordance with the design, 1926,451(a)(6) When is an engineer required?

The Bridge and Structural Engineer by IABSE -

For spans above 250 m` cable:stayed bridges are usually the most economical solution_ Conceptual and structural design of this bridge type with bridge decks made of steel` concrete or a combination of

FABRICATION AND ERECTION OF STRUCTURAL ... -

steel work including the “fabrication and erection,” and that is the subject matter of the present chapter to briefly introduce good fabrication and erection practices: 2:0 FABRICATION PROCEDURE Structural steel fabrication can be carried out in shop or at the construction site:

Balanced Cantilever Construction of Precast Segmental Bridges

On 45·70m spans, balanced cantilever construction of precast segmental bridges competes with incremental launching of prestressed·concrete decks and with steel bridges with concrete slab. Both structural types are often less expensive, but rarely faster to erect.

Balanced Cantilever Construction of Precast Segmental Bridges

On 45_70m spans, balanced cantilever construction of precast segmental bridges competes with incremental launching of prestressed_concrete decks and with steel bridges with concrete slab: Both structural types are often less expensive, but rarely faster to erect:

Bridge Construction Partner | Crane (Machine) | Precast

Bridge Construction Partner | Crane (Machine) | Precast Concrete ... bridge

PERI Group - Reorganization of the content

We have changed our content concept. From now on you will find the content you were looking for on the PERI website of your country. You will be redirected.

Slab and Bridge Deck Formwork ENKOFORM HMK -

The ultimate concrete formwork system to form bridge-decks and large slabs_ adaptable to different configurations. See why ULMA is the choice for bridge construction and heavy-civil work projects 1 844-343-5656